Tuxpan Port Terminal, Veracruz

TPT started operations in 2016 as the first automated Container Terminal in Mexico. With the ability to handle containers, general cargo, and RORO cargos we are the perfect port to call within the Gulf of Mexico. We have a dedicated Mexican Customs facility within the terminal complex as well as an Agricultural inspection point, offices for customs brokers, and local authorities all within TPTs terminal.

Specifications and services

Commodities Handled:

  • Containers
  • Autos / RORO
  • Steel Products
  • Wood Products
  • Project Cargo
  • Liquid Bulk

Location: 20°57’15” N, 97°19’41” W
TPT is located at the beginning of the API Tuxpan Corridor.

Hours of Operations:
Terminal: 24/7
Main Gate: Monday – Saturday

Size: 33 hectares, plus expansion capability of 8 hectares within the Terminal

Truck Gates: 4 inbound lanes, 4 outbound lanes

Maximum Static Container Capacity: 22,320 TEUS

Maximum Static Auto Capacity: 7,200 units

Scales: 3

Water Depth: 15 meters / 49 feet

Berths: 2 berthing positions

Total Berthing Length: 556 meters / 1,824 feet

Gantry Cranes: 4 ZPMC Super Post Panamax; 23 wide and 9 high on deck.

Lifting Capactity: 65 MT w/spreader, 100 MT with hook beam

Gauge: 30.48 meters / 100 feet

Terminal Equipment:

  • 8 ZPMC Automated Stacking Cranes (ASC)
  • 8 Top Loaders
  • 4 Side Loaders
  • 30 Tico Tractors
  • Forklifts from 3 – 28 MT
  • Roll Trailers

Reefer Services: 240 reefer plugs Pre-trip service provided

Warehouses: 1 – 3,900 square meters for LCL Cargo and Steel Coils

On Dock Agricultural Inspections: SADER (former SAGARPA) dry and refrigerated cargo inspection point

Fumigation facilities: Yes

Highway Access: 10 KM to the Tuxpan Mexico corridor, Highway 130D

Website: www.tpt.mx